Afghan War Diary · Field report

(EXPLOSIVE HAZARD) IED FOUND/CLEARED RPT (Components) CEXC : 0 INJ/DAM

Report date 2006-08-01 06:45:00 · Published by WikiLeaks on 25 July 2010 · View original report »

Date and time as displayed by wardiaries.wikileaks.org, which appears to shift report times by one to two hours; a report shown at 23:00 may belong to the following day.

Report keyRegionLatitudeLongitude
E2F6F494-2DDA-44B7-81C2-429D6AEB1178RC CAPITAL34.5719490168.99674988
DateTypeCategoryAffiliationDetained
2006-08-01 06:45:00Explosive HazardIED Found/ClearedENEMY0
EnemyFriendCivilianHost nationTotal
Killed in action00000
Wounded in action00000

Report text

(Delayed Report)At 0845Z, CEXC Kabul received a call from Kabul City Police (KCP) about an IED founded in West Kabul. CEXC responded to the site along with KCP elements. The Afghanistan National Directorate of Security (NDS) EOD team was conducting render safe procedures as we arrived. CEXC examined the IED at the scene with the NDS and it was determined to be a pre-placement of IED materials for future use. All items were recovered and are currently being held by NDS. Photos where taken of all evidence recovered.

Reproduced as published by WikiLeaks. “%%%” marks text that WikiLeaks redacted before publication.

Report keyE2F6F494-2DDA-44B7-81C2-429D6AEB1178
Tracking number2007-033-005830-0819
Attack onENEMY
Reporting unitCEXC
Unit nameCEXC
Type of unitNone Selected
Originator groupUNKNOWN
Updated by groupJTF Paladin 3rd EOD BN S-3
MGRS42SVD9970225576
DColorRED